Legal Agreement

Power Purchase –
Pay for Use Agreement
Terms & Conditions

Tenant Only Offtake. This document governs the sale and purchase of generated electricity between Power Box Pty Ltd (Supplier) and the occupying tenant (Buyer).

Version: October 2026
Power Box Pty Ltd — ACN 698 478 358
20 Clauses
Home/PPA Terms & Conditions
Contents
Preamble

Background

Recitals
  • a) The Landowner has granted the Supplier a lease or licence to install, maintain, and operate the System on the Property.
  • b) The Supplier agrees to sell the Consumed Electricity to the Buyer.
  • c) The Buyer agrees to purchase the Consumed Electricity from the Supplier.
Clause 1

Interpretation & Definitions

1.1 Definitions

The following definitions apply in this agreement:

TermDefinition
Applicable LawsAll applicable acts, subordinate legislation, rules, regulations, codes and industry guidelines.
Asset ParametersThe manufacturer limits, technical parameters, cycle limits, operating constraints and warranty conditions applying to the System or any Storage Solution.
AuthorisationAny consent, declaration, exemption, licence, notarisation, permit or waiver, including any renewal or amendment.
Business DayA day that is not a Saturday, Sunday or public holiday in the place in which the Property is located.
Change in LawThe enactment, amendment, repeal, reinterpretation or reapplication of any law, rule, standard, direction or regulatory requirement after the date of this agreement that materially affects the operation or economics of this agreement.
ChargesThe amounts payable by the Buyer to the Supplier, including charges for the Consumed Electricity calculated at the Energy Rate.
Commencement DateThe date of execution of this Agreement by the last of the parties to execute.
Commissioning DateThe later of the Commencement Date, and the first date that the System is capable of generating electricity for consumption by the Buyer.
Consumed ElectricityThe Generated Electricity consumed by the Buyer.
Consumption DataThe data which is collected or monitored by the Supplier in respect of the Consumed Electricity.
Due DateMeans ten (10) Business Days following the date of issue of a Tax Invoice.
EncumbrancesAll mortgages, charges, pledges, liens, security interests, retentions of title, other encumbrances and all rights of any other person adverse to the interest of the Supplier as owner of the System.
Energy RateThe amount as described in the Schedule, as adjusted from time to time in accordance with clause 8.
Environmental RightsAny rights, credits, offsets, allowances, entitlements, deductions, benefits or certificates relating to renewable energy or greenhouse gas emissions; or obtainable by or conferred on either party, or to which either party is or becomes entitled.
Exported ElectricityThat part of the Generated Electricity which is not the Consumed Electricity and is exported by the Supplier into the distribution network.
Feed-in TariffThe fees and other benefits received by the Supplier from the Exported Electricity.
Force Majeure EventAn event or circumstance beyond the reasonable control and not attributable to the fault or negligence of the party affected, including natural disasters, industrial action, riot, war, invasion, act of foreign enemies, hostilities, terrorism.
Generated ElectricityThe total amount of electrical energy (in kwh) generated by the System, as measured by the Metering Equipment.
GSTHas the same meaning as in the A New Tax System (Goods and Services Tax) Act 1999 (Cth).
Increase DateEach anniversary of the Commissioning Date after the second anniversary.
Increase PercentageThe percentage specified in the Schedule that the Energy Rate will increase under clause 6.
Insolvency EventIncludes inability to pay debts, entering into composition arrangements, appointment of a mortgagee, winding-up proceedings, liquidation, execution orders, or any analogous event under applicable laws.
LGCsLarge scale generation certificates created under Division 4 of the Renewable Energy (Electricity) Act 2000 (Cth).
Market RevenueAll revenue, payments, credits and benefits arising from market participation, ancillary services, FCAS, arbitrage, demand response, network support, aggregation or VPP activities using the System or any Storage Solution.
Metering EquipmentAll metering equipment owned by the Supplier and used to measure the Generated Electricity and Consumed Electricity.
PersonnelAny of a party's employees, advisers, officers, contractors, agents, representatives and nominees.
PPSAThe Personal Property Securities Act 2009 (Cth) and any regulations made under it.
STCsSmall-scale technology certificates created under Division 4 of the Renewable Energy (Electricity) Act 2000 (Cth).
Storage SolutionA battery energy storage system consisting of battery, wiring, conduits, and electrical components installed and operated by the Supplier on the Property.
SystemThe solar photovoltaic generation system consisting of solar panels, wiring, inverter, roof mounting, electrical components, Metering Equipment and any Storage Solution installed and operated by the Supplier on the Property.
System DataThe generation, consumption, battery, telemetry, metering, control and derived data collected or monitored in respect of the System or the supply of electricity under this agreement.
TermHas the meaning set out in clause 5.
1.2 Rules for Interpretation

The following rules apply in interpreting this Agreement, except where the context makes it clear that a rule is not intended to apply:

  • a) Capitalised terms shown in the Schedule have the meanings given to them in the Schedule.
  • b) Headings are for convenience only, and do not affect interpretation.
  • c) A singular word includes the plural, and vice versa.
  • d) This document is not to be interpreted against the interests of a party merely because that party proposed this document or some provision in it.
  • e) A reference to legislation is to that legislation as amended, re-enacted or replaced; "$" or "dollar" is to Australian currency; a document or agreement includes that document as amended; a party includes permitted substitutes or assigns; a person includes any entity or body of persons.
Clause 2

Pre-Conditions to Supply

2.1 Pre-conditions

The Supplier is not required to commence supply of Generated Electricity until the following Pre-conditions are satisfied or waived:

  • a) The Buyer having demonstrated, to the Supplier's satisfaction, that it is and will continue to be a tenant or permitted occupant of the Property for the Term.
  • b) The Supplier having agreed with the Landowner acceptable terms allowing for the Installation of the System on the Property.
  • c) The Supplier negotiating a Feed in Tariff at a rate and on terms to the Supplier's satisfaction.
  • d) Unless an agreed Energy Rate is shown in the Schedule — the Supplier nominating the Energy Rate and the Buyer accepting the Energy Rate in writing.
  • e) The Supplier being satisfied that the Installation of the System will cause the creation of an adequate quantity of STCs, LGCs or other Environmental Rights.
  • f) If the Supplier notifies the Buyer that a Parent Guarantee or Director's Guarantee is required — receipt by the Supplier of the Parent Guarantee or Director's Guarantee, executed by the Guarantor.
  • g) Receipt by the Supplier of all Authorisations required for the Installation and operation of the System on the Property.
  • h) The Supplier has completed Installation of the System.
2.2 Waiver of Pre-conditions
  • a) The Pre-conditions are for the benefit of the Supplier.
  • b) Only the Supplier may rely on a Pre-condition, and only the Supplier may determine whether a Pre-condition has been satisfied or fulfilled.
  • c) The breach or non-fulfilment of a Pre-condition may only be waived by the Supplier in writing.
2.3 Obligation to assist in satisfying Pre-conditions

The Buyer must: provide a letter of authorisation for energy consumption data; provide all relevant data on current electricity usage; file or assist the Supplier to file all necessary notices and applications; use best endeavours to ensure each Pre-condition is satisfied; and promptly advise the Supplier of satisfaction of a Pre-condition.

2.4 Result of non-satisfaction of Pre-conditions

The Supplier may (but is not obliged to) terminate this Agreement with immediate effect by giving written notice to the Buyer if the Pre-conditions are not satisfied within 2 months of the Commencement Date.

Clause 3

Variation before Installation

  • a) If Installation of the System has not commenced at Commencement Date, the Supplier may notify the Buyer of a variation of the Charges if the Supplier reasonably believes its actual costs associated with Installation will exceed original estimated costs by more than 5%. Such variation will include details regarding the Supplier's calculation and justification.
  • b) To effect a variation, the Supplier must send a written notice to the Buyer no less than 5 Business Days before the commencement of Installation.
  • c) In response to such a notice, the Buyer may terminate this Agreement provided that it does so in writing within 5 Business Days of the notice.
Clause 4

Buyer's Consent

4.1 Grant of consent
  • a) The Buyer grants consent for the Supplier to Install the System and Metering Equipment on the Property, and to operate, monitor, maintain, repair, service, dismantle, remove and replace the System.
  • b) The Supplier may, but is not obliged to, install, own and operate a Storage Solution on the Property. The Storage Solution forms part of the System. The Supplier may also install telemetry, communications and control equipment reasonably required for optimisation, aggregation or VPP services, at the Supplier's cost.
Clause 5

Term of Agreement

The term of this Agreement starts on the Commencement Date and continues for the period specified in the Schedule (Term), subject to earlier termination in accordance with the terms of this Agreement or by mutual consent.

At the end of the Term and any Extension Period (Renewal Date), the contract will renew on the same terms for any Extension Period shown in the Schedule unless either party sends a termination notice to the other party between 180 and 60 calendar days prior to the Renewal Date.

Clause 6

Sale and Purchase of Generated Electricity

  • a) The Supplier has exclusive control over the operation of the System, including any Storage Solution, and over all dispatch, charging, discharging and optimisation decisions. Unless otherwise agreed in writing, the Supplier may apply the following operating priority:
    • i. supply the Buyer's load using on-site generation to the extent available;
    • ii. charge the Storage Solution using on-site generation; and
    • iii. export or otherwise use remaining generation for Feed in Tariff, Market Revenue, aggregation or VPP activities.
  • b) The Buyer acknowledges and agrees that the Supplier may operate the System for optimisation, aggregation and VPP purposes, provided the Supplier continues to make available Consumed Electricity to the Buyer in accordance with this agreement.
  • c) During the Term, the Buyer must not, and must ensure that its personnel, contractors and any occupier of the Property do not, appoint or permit any other person to control, optimise, aggregate or provide equivalent services in respect of the System, without the Supplier's prior written consent.
  • d) The Supplier owns all right, title and interest in the Generated Electricity. The Supplier will make the Generated Electricity available at the output terminal of the System for the Buyer to purchase Consumed Electricity from the Commissioning Date.
  • e) The Buyer agrees to purchase the Consumed Electricity from the Supplier and will pay the Charges as set out in clause 7.
  • f) Title to, and ownership of, the Consumed Electricity will pass from the Supplier to the Buyer at the output terminal of the System, provided the Buyer pays for the purchase of the Consumed Electricity.
  • g) The Supplier will be entitled to retain any Feed in Tariff, Market Revenue and any other revenue, payment, credit or benefit arising from the System other than Charges payable by the Buyer, unless the parties expressly agree otherwise in writing.
Clause 7

Payment of Charges

7.1 Basis of Charges

Subject to clause 8, the Charges will be the Consumed Electricity times the Energy Rate, exclusive of GST.

7.2 Substituted Reads
  • a) Where the Supplier cannot measure the Consumed Electricity for any reason, including any error with the Metering Equipment or lack of internet connection, it may invoice the Buyer for the Charges based on an estimated quantity of Consumed Electricity for the relevant period.
  • b) An estimated quantity of Consumed Electricity will have regard to historical patterns of Consumed Electricity in any prior years.
7.3 Tax Invoice

Within 5 Business Days after the end of each month the Supplier will issue the Buyer a Tax Invoice setting out the Charges payable by the Buyer.

7.4 Payment of Charges

The Buyer must pay the Charges to the Supplier by the Due Date.

7.5 Failure to pay Charges
Late Payment Consequences

If the Buyer fails to pay the Charges by the Due Date: (i) interest will be payable on the unpaid amount from the Due Date at 6% above the Reserve Bank of Australia's published cash rate; (ii) the Supplier may issue a breach notice and may suspend, limit or discontinue supply; (iii) may refer the Tax Invoice to a debt collection agency; (iv) may charge a fee covering costs of recovering outstanding amounts, including legal costs.

7.6 Account in credit

If the Buyer's account is in credit as a result of an adjustment or overpayment, such credit will be carried forward and applied as a credit to the Buyer's next Tax Invoice or, at the Supplier's sole election, set off against any other amount due and payable by the Buyer to the Supplier.

7.7 Disputed Tax Invoice
  • a) The Buyer must raise any dispute concerning a Tax Invoice before the Due Date. Such a dispute must be in writing and state the amount in dispute and reasons.
  • b) The Buyer must pay any amount not in dispute by the Due Date.
  • c) The Supplier will investigate any notification of such dispute. Should the Supplier determine that the dispute is resolved or is without merit, the amount owing will be payable by the Buyer immediately upon notice of the determination.
Clause 8

Energy Rate Increase

  • a) The Energy Rate may only change: (i) by the agreed Increase Percentage; (ii) by written agreement; or (iii) if a Change in Law causes a direct increase in Supplier costs, to the extent of that increase, supported by reasonable evidence.
  • b) On each Increase Date, the Energy Rate payable from that Increase Date until the next Increase Date will be increased by the Increase Percentage (specified in the Schedule), without requirement of notice. In no event will the Energy Rate decrease.
Important Note

Rate increases begin from each anniversary of the Commissioning Date after the second anniversary. The Increase Percentage is specified in your individual Schedule. In no event will the Energy Rate decrease.

Clause 9

GST

9.1 Payment of GST

As recipient of a taxable supply under this Agreement, the Buyer must pay to the Supplier, in addition to the consideration for the taxable supply, any GST paid or payable by the Supplier in respect of the taxable supply. The Buyer must pay the GST to the Supplier on the same day as the due date for consideration for the taxable supply, or if there is no due date, within seven (7) days of receiving a written request or a tax invoice from the Supplier.

9.2 Reimbursements

A party's obligation to reimburse another party for an amount paid or payable to a third party includes GST on the amount paid or payable to the third party except to the extent that the party being reimbursed is entitled to claim an input tax credit for that GST.

9.3 Adjustment note

The Supplier may issue an adjustment note to the recipient or in lieu of, allow for a credit reflecting the same in favour of the Buyer, within 14 days of becoming aware of an adjustment event relating to a taxable supply under this Agreement.

9.4 Indemnities

If a payment under an indemnity gives rise to a liability to pay GST, the Buyer must pay, and indemnify the Supplier against, the amount of that GST. If a party has an indemnity for a cost on which that party must pay GST, the indemnity is for the cost plus all GST.

Clause 10

Installation of System

10.1 Requirements for installation

If at Commencement Date the Installation of the System has not commenced, or has commenced but is not completed, then as the Supplier may require:

  • a) The Buyer must confirm in writing that the area for Installation is fully constructed and no works are planned that would affect the Installation.
  • b) The Buyer must provide all information and assistance reasonably required by the Supplier in connection with Authorisations required for Installation.
  • c) Subject to the requirements of this clause being met, the Supplier must obtain Authorisations required for the Installation and operation of the System.
  • d) The Buyer must ensure, at its cost, that the area for Installation is clear and free from rubbish and in a suitable condition.
  • e) The Supplier must obtain all necessary consents, tenure and rights from the Landowner to enable the Supplier to perform this Agreement.
  • g) The Buyer must arrange, at its cost, any upgrade to the electricity metering infrastructure on the Property required to meet the relevant Australian standard or required by the electricity Distributor.
10.2 Ownership of System
  • a) The Supplier owns the System and may transfer ownership of or charge its interest in the System to any person.
  • b) During the Term, the Buyer must not, and must not allow any third party, to make the System or any part of it subject to an Encumbrance.
  • c) The Buyer agrees that the System is a chattel and not a fixture.
  • d) The Supplier may apply for any registration, or give any notification, in connection with this Agreement and the Supplier's interest in the System and the Licence, including under the PPSA. The Buyer consents to any such registration or notification and waives its right to receive a verification statement.
  • f) Only the Supplier or its Personnel may maintain, monitor, repair, replace, do works upon or otherwise modify, install or remove all or any part of the System. The Buyer must not engage, instruct, or permit any other person to maintain, monitor, repair, replace, do works upon, modify, install or remove all or any part of the System.
10.3 No liability for delay

The Buyer acknowledges and agrees that the Supplier shall have no liability under or in connection with this Agreement or otherwise at law for any delay in connection with the Installation of the System or the achievement of the Commissioning Date.

Clause 11

Access to Property

11.1 Time and method of access
  • a) The Supplier and its Personnel may, with no less than 2 Business Days' notice to the Buyer (except in an emergency in which case no notice is required), access the Property to install, operate, maintain, monitor, repair, service, dismantle, remove and replace the System and any related equipment.
  • b) The Buyer must provide reasonable access to switchboards, meters, communications equipment, internet connectivity and other infrastructure reasonably required for the Supplier to operate the System and any Storage Solution.
  • c) The Buyer must ensure the Supplier's access to the Property is safe and unhindered, and that the Supplier can access the Property immediately if access is required urgently.
  • d) If the Supplier does not have safe and unhindered access and this results in incurring Personnel costs, the Buyer will reimburse these costs.
  • e) If the Supplier does not have safe and unhindered access and this results in a reduction in the quantity of Generated Electricity, the Supplier may invoice the Buyer based on a deemed quantity of Generated Electricity, having regard to historical patterns.
Clause 12

Supplier's Obligations

12.1 Supplier's obligations regarding the System

The Supplier and its Personnel must ensure that when accessing the Property to perform works they: cause as little disturbance as possible to the Buyer; comply with all Applicable Laws; obtain, maintain and comply with all applicable Authorisations; remove all rubbish or debris; repair any damage caused; ensure heavy equipment complies with floor loading weights; maintain the System in a good and safe state of repair; promptly respond to, and restore, any outage to the System; and take reasonable steps to ensure the System does not unduly risk the safety of the Buyer and its Personnel and property.

12.2 Availability and Interruption

The Supplier may reduce, interrupt or suspend operation of the System or supply under this agreement where reasonably required for maintenance, network constraints or directions, compliance with law or Authorisations, optimisation, aggregation, VPP participation, safety or Force Majeure. Where reasonably practicable, the Supplier will give prior notice of planned interruptions. An interruption permitted by this clause does not of itself constitute a breach of this agreement.

12.3 Asset Parameters

The Supplier may operate the System and any Storage Solution only within the applicable Asset Parameters. The Supplier may restrict dispatch, charging or discharging where necessary to comply with manufacturer requirements, cycle limits, warranties, network requirements or safety obligations. The Buyer acknowledges that operation of any Storage Solution may be constrained by those limitations.

12.4 Product development (VPP)

The Supplier may use aggregated or de-identified data from the System to develop portfolio products and services, including aggregation and VPP services.

12.5 Multi-site rollout

The parties may agree in writing to apply this Agreement (or a copy of it) to additional sites. Each additional site will be added by a short site schedule signed by the parties.

Clause 13

Warranties

13.1 Warranties

Each party warrants and represents that: it is duly incorporated and validly exists; it has full legal capacity and power to own its property and to carry on its business; it has full legal capacity and power to enter, and has taken all corporate action to authorise, entry into this Agreement; this Agreement constitutes legal, valid and binding obligations of the party, enforceable in accordance with its terms; it is not affected by an Insolvency Event; and no litigation, arbitration, mediation, conciliation or administrative proceeding is taking place or, to the best of its knowledge, pending or threatened whose outcome is likely to have a material adverse effect on its ability to perform its obligations under this Agreement.

13.2 Buyer's acknowledgments

The Buyer acknowledges that, except for statutory warranties: neither the Supplier nor any Personnel has made any express or implied representation or warranty concerning the System or this Agreement; the Buyer has informed itself and made its own inquiries and assessments as to the capabilities of the System, and has had the opportunity to obtain its own legal, financial and technical advice; and no statements, representations, warranties or promises have induced or influenced the Buyer to enter into this document.

Clause 14

Buyer Obligations

14.1 No interference
  • a) The Buyer will ensure that the System is kept secure and will promptly notify the Supplier of any suspected damage, interference, outages, Authority notices, safety issues or other matters affecting the System. The Buyer must not, and must ensure that no third party does, interfere with, damage, obstruct, shade, override or otherwise adversely affect the operation of the System, any Storage Solution, or any telemetry, communications or control equipment used in connection with the System.
  • b) Where the quantity of Generated Electricity is reduced as a result of damage or interference, the Supplier may invoice the Buyer based on a deemed quantity of Generated Electricity, having regard to historical patterns.
14.2 Outgoings

The Supplier is not required to pay any outgoings or costs in relation to the Property.

Clause 15

Environmental Rights etc

  • a) The Supplier is entitled to all Environmental Rights, Market Revenue and any other rights, credits, payments or benefits associated with the provision of services from the System, including rights arising from electricity supply, emissions reduction, ancillary services, demand response, aggregation or VPP activities.
  • b) The Buyer must provide all assistance reasonably necessary to enable the Supplier to register, claim, transfer or monetise those rights, and indemnifies the Supplier for loss resulting from their revocation to the extent caused by the Buyer's breach of this agreement.
Clause 16

No Guarantee of Supply

  • a) The Buyer acknowledges that the Supplier is not responsible for the quantity or quality of the supply of electricity to the Property, including by the Buyer's electricity retailer and distributor.
  • b) The Buyer acknowledges that the benefits and costs of entering into this Agreement are dependent on a number of factors beyond the control of the Supplier, including the variability, the cost, and quantity of electricity consumed by the Buyer.
  • c) The performance of the System is subject to variable factors, including the number of hours of sunlight, pollution, shading, cloud cover and weather patterns, the location of the System and surrounding structures and flora.
Clause 17

Limitations of Liability

17.1 Exclusion of warranties

Except for any warranties or guarantees required or implied by Applicable Law, the Supplier gives no express warranty or guarantee in relation to the System (including its performance) or its Installation.

17.2 Limitations of Liability
Liability Cap

Each party's total liability under this Agreement is capped at the higher of (i) $500,000 and (ii) 2 times the Charges paid in the last 12 months. The cap does not apply to death or personal injury, wilful misconduct or fraud, or third party property damage.

To the full extent permitted by law, under no circumstance is the Supplier liable to the Buyer (whether in contract, tort including negligence, or otherwise) for: (i) loss of profit, revenue or anticipated savings, business interruption, loss of use, loss of production, loss of generation, loss of chance or business opportunity, loss of or damage to goodwill or reputation, increased cost of electricity, or any other kind of financial or economic loss, or claims by third party for liquidated sums; or (ii) indirect or consequential loss, even if the Buyer has advised the Supplier of that possibility.

The limitations and exclusions in clauses 17.2(a) do not apply to any liability for personal injury or death; third party claims and third party property damage; events in respect of which insurance proceeds are received or would have been received; fraud or wilful default; or fines and penalties.

Clause 18

Default and Termination

18.1 Default

A party is in default if: (a) it breaches any material provision of this Agreement, and the breach continues for fifteen (15) Business Days after notice in writing from the other party specifying the breach; (b) an Insolvency Event occurs in relation to such party; or (c) in the case of the Buyer, it fails to pay any amount when due under this Agreement within 5 Business Days after receipt of a breach notice from the Supplier.

18.2 Termination by either party on default

If a party is in default under clause 18.1, the other party may terminate this Agreement with immediate effect by written notice to the party in default.

18.3 Termination by the Supplier

The Supplier may terminate this Agreement with immediate effect by written notice to the Buyer if:

  • a) the Generated Electricity over any consecutive six (6) month period during the Term is reduced by ten (10) percent or more compared to the usage estimates on which the engineering design was initially calculated, as a result of the acts or omissions of the Buyer or any external influence;
  • b) the Property is damaged or destroyed or becomes wholly or partially unfit for the continued operation of the System;
  • c) access to the Property becomes materially diminished or impossible;
  • d) the Buyer ceases to occupy the Property;
  • e) either of the Buyer's lease or the Supplier's lease at the Property ends or is terminated; or
  • f) any Authorisation required for the installation or use of the System lapses or is rejected or terminated or otherwise unattainable.
18.4 Change in law / hardship

If a Change in Law makes this agreement unlawful or materially more expensive to perform, the Supplier may give written notice describing the change, the cost impact, and a reasonable proposal to keep the agreement running. The parties must meet within 10 Business Days and use reasonable efforts to agree changes. If they do not agree within 30 Business Days, either party may terminate by 20 Business Days' notice. Termination under this clause does not affect amounts already due.

18.5 Removal
  • a) The Supplier's rights under this Agreement continue for a reasonable period after termination, until the Supplier has disconnected and removed the System.
  • b) When removing the System, the Supplier will use its best endeavours to restore the Property to a condition as it was before Installation of the System, subject to ordinary wear and tear and unavoidable consequences of the Installation and removal works.
Clause 19

Assignment

19.1 Assignment by Buyer

The Buyer may only assign its rights under this Agreement with the written consent of the Supplier, which may be subject to conditions required by the Supplier in relation to the Buyer or the proposed assignee.

19.2 Assignment by Supplier

The Supplier may assign, novate or grant security over this agreement and its rights in the System to a related body corporate, any financier or its nominee, or a purchaser or investor in the System, by notice to the Buyer. The Buyer may assign its rights only with the Supplier's prior written consent, not to be unreasonably withheld or delayed.

19.3 Financier step-in

If the Supplier gives the Buyer a default notice, the Supplier must also give a copy to any financier notified by the Supplier. That financier may cure the Buyer's default within the applicable cure period, and if it does so the Supplier must not terminate for that default.

Clause 20

General

20.1 Notice

A notice, consent or other communication under this Agreement is only effective if it is in writing, signed and either left at the addressee's address or sent to the addressee by mail or email.

20.2 Governing law

This Agreement is governed by the law in force in the jurisdiction in which the Property is located, which shall be the forum for any litigation arising.

20.3 Retailer Exemption requirements
  • a) The Supplier has obtained a Retailer Exemption from the Australian Energy Regulator or other applicable regulator and is bound by the conditions of the Retailer Exemption.
  • b) The Supplier will comply with the conditions imposed on it by the Australian Energy Regulator or applicable regulator.
  • c) The Supplier is not bound by all obligations under the Applicable Law relating to retailing of electricity that apply to an authorised Retailer.
20.4 Liability for costs and expenses

Each party will bear its own costs and expenses incurred in connection with any legal professional fees for the negotiation, preparation, execution of this Agreement.

20.5 Operation of this Agreement

This Agreement contains the entire agreement between the parties about its subject matter. Any previous understanding, agreement, representation or warranty relating to that subject matter is replaced by this Agreement and has no further effect.

20.6 Counterparts

This Agreement may be executed in counterparts and by electronic means.

20.7 Confidentiality
  • a) The Supplier owns System Data and Consumption Data.
  • b) The Supplier may install and use telemetry, monitoring and communications equipment.
  • c) The Supplier may use System Data and Consumption Data to operate, maintain and improve the System and, in aggregated or de-identified form, to develop, deliver and optimise portfolio and VPP services.
  • d) The Supplier must not disclose the Buyer's confidential information except as permitted by this agreement or by law.
  • e) Neither party may divulge to any person (other than to those of its officers, employees and agents who reasonably require the information to enable them to properly perform their duties) any of the contents of this Agreement or any other information concerning the operations, dealings, transactions, contracts or commercial or financial affairs of the other party (Confidential Information).
  • f) The restrictions imposed by clause 20.7(a) on each party as a recipient of Confidential Information do not apply to disclosure: to its Personnel or any Related Body Corporate (provided a similar undertaking of confidentiality is in place); to the extent required by any Applicable Laws or the regulations of any recognised stock exchange; or to the extent that the same has become generally available to the public other than due to breach of the recipient's confidentiality undertakings.
20.8 Force Majeure
Force Majeure

If a party is affected by a Force Majeure Event, it must give the other parties a notice containing full particulars of the Force Majeure Event (including its nature and likely duration), the obligations under the Agreement that are affected and the nature and extent of the effects of the Force Majeure Event on those obligations. A party affected by a Force Majeure Event will not be required to perform its obligations under this Agreement (other than an obligation to pay money) to the extent they are affected by the Force Majeure Event, until the Force Majeure Event has ceased. A party affected by a Force Majeure Event must mitigate the impact of the Force Majeure Event upon the performance of its obligations under this Agreement.

End of Agreement

This document sets out the standard terms and conditions for the Power Purchase – Pay for Use Agreement (Tenant Only Offtake). Individual agreements are supplemented by a Schedule which specifies the Energy Rate, Term, Increase Percentage, and site-specific details. Power Box Pty Ltd | ACN 698 478 358 | L32/200 George Street, Sydney NSW 2000